Buying A Solar Panel Part 5

The technical survey has now been completed.

The design process will take up to a week (Mainly deciding on how to fix the panels down to stop them being ripped off in the next gale force winds that come along).

We have been told to expect a call early next week to arrange the actual installation. The install should take 3 days: 1 to put up the scaffolding; 1 to do the actual fitting; and 1 to take the scaffolding down.

Exciting stuff.